Example of Report Content

  1. Scope and Site Data
  2. Pre Survey
  3. Installation and Setup
  4. Visit Objectives
  5. Calibration date for the Main LV Board Analyzer.
  6. Photograph of Analyzer Installation
  7. Symbol Table 
  8. Load, PF and Harmonic Measurements
  9. Short Circuit Fault Levels
  10. Power Quality 
  11. Voltage Disturbance and Harmonic Distortion
  12. RESULTS MAIN LV MCC
  13. Maximum - Total 3 phase Watts
  14. Maximum Loads - Total 3 phase kVA
  15. Average Power Factor (L1, L2, L3)
  16. Maximum – Amps per phase (L1, L2, L3)
  17. Max and Minimum - Frequency
  18. Max and Minimum - Voltage (L1-N, L2-N, L3-N)
  19. Max - Voltage (L1-L2, L2-L3, L3-L1)
  20. Maximum – L1, L2, L3 3rd Harmonic Current
  21. Maximum - Neutral Current
  22. Limits of Harmonic Distortion Electricity Council Recommendations G5/4 
  23. Commercial considerations of ER G5/4 
  24. Effects of Excess Harmonic Distortion irrespective of ERG5/4
  25. Extracts from ER G5/4
  26. Average – Total LV % THD Voltage (L1, L2, L3)
  27. Average - H05 Actual 5th Current (L1, L2, L3)
  28. Average - H07 Actual 7th Current (L1, L2, L3)
  29. The following items are for info only 
  30. Better Grounding
  31. Grounding Design
  32. Example of Protection on Emergency Generators
  33. Example of a VSD Installation Non-Compliance
  34. Example of a MCC VSD Installation Non-Compliance
  35. Supply Transformer Details 
  36. Bullet Point Recommendations and Comments

 

 

 


 

 


 


Copyright © 2004-2007 Electrowave Power Solutions Ltd. All Rights Reserved.

 

Home | Services | Support | Training | Contact Us | News | Jobs | Links

Copyright © 2004-2007 Electrowave Power Solutions Ltd. All Rights Reserved.

 

 

 

counter stats